RR No. 7-2022 sets BIR rules for renewable energy tax incentives, including ITH, 10% CIT, VAT zero-rating, VAT-free imports, and required filings.

Renewable energy developers, suppliers of locally produced renewable energy equipment, and biomass-related agricultural producers must secure the proper DOE, BOI, and BIR documentation before claiming tax incentives under the Renewable Energy Act. RR No. 7-2022 matters immediately because the incentives are substantial, including a seven-year income tax holiday, a 10% corporate income tax rate after the income tax holiday, zero-rated VAT on qualifying renewable energy transactions, VAT-free importation for qualifying renewable energy equipment components, and tax exemption for carbon credit proceeds. However, the benefits are not automatic: failure to attach required certificates to the annual income tax return, or failure to satisfy reportorial requirements, can result in loss of the incentive for the taxable year and exposure to penalties under applicable law.

What Changed Under RR No. 7-2022

RR No. 7-2022 provides the implementing tax rules for the incentives granted under Republic Act No. 9513, or the Renewable Energy Act of 2008. The regulation consolidates the policies and guidelines for availing tax incentives under Sections 15, 19, 21, 22, 23, 25, and 26 of the Renewable Energy Act, covering both power and non-power applications of renewable energy projects.

The key change is that the BIR expressly sets out the documentary, registration, certification, and filing requirements that renewable energy taxpayers must satisfy before claiming the incentives. The regulation covers renewable energy developers engaged in exploration, development, utilization, and operation of renewable energy systems and facilities. It also covers manufacturers, fabricators, and suppliers of locally produced renewable energy equipment, farmers and entities producing biomass resources, and purchasers of renewable energy equipment for residential, industrial, or community use.

The regulation recognizes renewable energy resources such as biomass, solar, wind, geothermal, ocean energy, hydropower, and other emerging renewable energy technologies. It also addresses hybrid and co-generation systems, but only in proportion to the renewable energy component. This means that taxpayers using both conventional and renewable energy technologies cannot claim renewable energy incentives for the entire project unless the entire project qualifies as renewable energy.

Who Is Affected

RR No. 7-2022 directly affects existing and new renewable energy developers with DOE service or operating contracts, including those operating power plants, non-power applications, geothermal projects, hydropower facilities, solar projects, wind projects, biomass projects, ocean energy systems, and hybrid systems with a renewable energy component.

The regulation also affects manufacturers, fabricators, and suppliers of locally produced renewable energy equipment and components. These taxpayers must be recognized and accredited by the DOE and registered with the BOI before they may claim incentives such as income tax holiday, VAT-free importation, and zero-rated VAT on qualifying transactions.

Local suppliers, contractors, and subcontractors dealing with duly registered renewable energy developers are also affected. The regulation states that local suppliers and sellers of goods, properties, and services should not pass on 12% VAT to duly registered renewable energy developers on purchases used for development, construction, and installation of power plant facilities, and for the process of exploring and developing renewable energy sources up to conversion into power.

Farmers and entities engaged in the plantation of crops and trees used as biomass resources are affected because the regulation provides VAT exemption on agricultural inputs, equipment, and machinery within ten years from the effectivity of the Renewable Energy Act, subject to DOE certification and actual use requirements. Non-VAT registered purchasers of renewable energy equipment for residential, industrial, or community use are also affected because RR No. 7-2022 recognizes a tax rebate equivalent to the VAT passed on to them, in the form of a tax credit against income tax liability for the year of purchase.

Required Registrations and Certifications Before Claiming Incentives

Renewable energy incentives under RR No. 7-2022 are not self-executing. Existing and new renewable energy developers, as well as manufacturers, fabricators, and suppliers of locally produced renewable energy equipment, must register with the DOE through the Renewable Energy Management Bureau. A DOE Certificate of Registration is issued to a renewable energy developer holding a valid renewable energy service or operating contract. For existing renewable energy projects, the new renewable energy service or operating contract pre-terminates and replaces the prior service contract executed with the DOE.

Manufacturers, fabricators, and suppliers of locally produced renewable energy equipment must secure a DOE Certificate of Accreditation. Renewable energy developers must also secure a DOE Certificate of Endorsement before the first year of availment of the 10% corporate income tax rate incentive. Manufacturers, fabricators, and suppliers importing components, parts, and materials for renewable energy equipment must secure a DOE Certificate of Endorsement on a per-importation basis.

BOI registration is also required. Renewable energy developers, manufacturers, fabricators, and suppliers of locally produced equipment must register with the Board of Investments to qualify for incentives under the Renewable Energy Act. For the income tax holiday, a Certificate of ITH Entitlement issued by the BOI is a required attachment to the annual income tax return filed with the BIR. The regulation expressly warns that failure to attach the Certificate of ITH Entitlement to the annual income tax return may result in forfeiture of the income tax holiday incentive for the covered taxable year.

Income Tax Holiday, NOLCO, and 10% Corporate Income Tax Rate

RR No. 7-2022 confirms that duly registered renewable energy developers may be exempt from national government income taxes through an income tax holiday. Existing renewable energy projects are entitled to an income tax holiday for seven years from the start of commercial operations. Commercial operation is tied to issuance of a Certificate of Compliance by the Energy Regulatory Commission and readiness to inject power to the grid.

New investments in renewable energy resources are also entitled to a seven-year income tax holiday from the start of commercial operations resulting from the new investment. Developers undertaking discovery and development of new renewable energy resources distinct from registered operations may qualify as new projects, provided separate books of accounts are set up and registered with the BIR office where the developer is required to be registered.

Additional investments in a renewable energy project may also qualify for an income tax holiday, but the availment for additional investments must not be more than three times the period of the initial availment by the existing or new renewable energy project. The income tax holiday for additional investments applies only to income attributable to the additional investment. Additional investment may include improvements, modernization, or rehabilitation registered with the DOE, whether or not they result in increased capacity.

RR No. 7-2022 also provides a special NOLCO rule. The net operating loss carry-over of the renewable energy developer during the first three years from the start of commercial operation may be carried over as a deduction from gross income for the next seven consecutive taxable years immediately following the year of loss. This is allowed only if the NOLCO has not previously been offset as a deduction and the loss resulted from operations, not from the availment of incentives under the Renewable Energy Act.

After the income tax holiday, registered renewable energy developers are subject to a 10% corporate income tax rate on net taxable income, provided that the savings are passed on to end-users in the form of lower power rates. Renewable energy developers that acquire, operate, or administer existing renewable energy facilities that were already in commercial operation for more than seven years upon the effectivity of the Renewable Energy Act are not entitled to the income tax holiday, except for additional investment in renewable energy resources, but they may pay the 10% corporate income tax rate upon DOE registration.

VAT Incentives and Zero-Rating Rules

The sale of power or fuel generated through renewable sources of energy, including biomass, solar, wind, hydropower, geothermal, ocean energy, and other emerging energy sources using technologies such as fuel cells and hydrogen fuels, is subject to 0% VAT. Ancillary services generated through renewable sources of energy are also subject to 0% VAT.

Purchases by a renewable energy developer of local goods, properties, and services needed for the development, construction, and installation of plant facilities, and for the process of exploring and developing renewable energy sources up to conversion into power, are also subject to 0% VAT. This expressly includes services performed by subcontractors and contractors. Local suppliers must require copies of the buyer’s BOI registration and DOE registration for purposes of availing the 0% VAT incentive.

All proceeds from the sale of carbon emission credits are exempt from any and all taxes. This is a significant incentive for renewable energy businesses with carbon credit revenue streams, but the taxpayer should still maintain complete documentation proving the nature of the proceeds and their connection to carbon emission credits.

Hybrid and Co-Generation Systems

For hybrid and co-generation systems using both renewable energy sources and conventional energy, RR No. 7-2022 limits the tax incentives to the renewable energy component. The tax exemptions and incentives apply only to equipment, machinery, and devices utilizing renewable energy resources. The renewable energy developer must secure a DOE certification distinguishing the equipment, machinery, or devices utilizing renewable energy resources.

For common facilities in hybrid and co-generation systems, the DOE must certify the renewable energy capacity in megawatts to determine the ratio of tax exemption privileges to be granted. If the developer claims the income tax holiday, a BOI Certificate of ITH Entitlement must also be secured and attached to the annual income tax return filed with the BIR.

Incentives for Renewable Energy Equipment Manufacturers and Suppliers

Manufacturers, fabricators, and suppliers of locally produced renewable energy equipment and components, if duly recognized and accredited by the DOE and registered with the BOI, may avail of VAT-free importation of components, parts, and materials necessary for the manufacture or fabrication of renewable energy equipment and components. The imported items must not be manufactured domestically in reasonable quantity and quality at competitive prices, as certified by the DTI. They must also be directly and actually needed and used exclusively in the manufacture or fabrication of renewable energy equipment.

The importation must be covered by shipping documents in the name of the duly registered manufacturer or fabricator to whom the shipment will be directly delivered by customs authorities, and prior DOE approval must be obtained before importation. RR No. 7-2022 also states that these importations are not subject to the issuance of an Authority to Release Imported Goods under RMO No. 35-2002, as amended, and may be released by the Bureau of Customs without an ATRIG, although the BIR may conduct a post-investigation or audit.

These manufacturers, fabricators, and suppliers are also entitled to a seven-year income tax holiday and exemption starting from the date of registration and accreditation with the appropriate government agencies, including the DOE and BOI. The exemption applies only to net income derived from the sale of renewable energy equipment, machinery, parts, and services.

Their transactions with local suppliers of goods, properties, and services needed in the manufacture or fabrication of renewable energy equipment are subject to zero-rated VAT, provided that local suppliers require the BOI registrations and DOE registration or accreditation of the manufacturer, fabricator, or supplier and of the recipient renewable energy developer.

Biomass Farmers, RE Purchasers, and the Prohibition on Double Availment

Individuals and entities engaged in the plantation of crops and trees used as biomass resources are exempt from VAT on all types of agricultural inputs, equipment, and machinery within ten years from the effectivity of the Renewable Energy Act, subject to DOE certification. The crops and trees, including jatropha, coconut, and sugarcane, must be actually utilized for the production of biomass resources. The inputs, equipment, and machinery must be actually and primarily used for the production of biomass resources.

Purchasers of renewable energy equipment for residential, industrial, or community use are entitled to a rebate equivalent to the VAT passed on to them. The rebate is available only to purchasers who are not VAT-registered and is granted in the form of a tax credit from the purchaser’s income tax liability during the year of purchase. Any unused rebate or tax credit is forfeited.

RR No. 7-2022 also prohibits double availment of incentives. Unless otherwise provided by law, registration or accreditation to avail of incentives under the Renewable Energy Act disqualifies the taxpayer from availing of other tax and non-tax incentives under the National Internal Revenue Code, as amended by the CREATE Act.

Annual Filing Requirements, Deadlines, and Penalties

Renewable energy developers and manufacturers, fabricators, and suppliers of locally produced renewable energy equipment availing themselves of incentives must comply with the filing and reportorial requirements under the CREATE Act. Non-compliance with filing and reportorial requirements will be met with penalties under the law.

For the 10% corporate income tax rate, the renewable energy developer must submit to the BIR a copy of the DOE Certificate of Endorsement before the first year of availment, a valid and subsisting renewable energy service or operating contract, and the corresponding Certificate of Registration. The developer must also attach to its income tax return a sworn undertaking stating that, for the year of availment, it has not breached its obligations under the renewable energy service or operating contract and that it will pass on the tax savings in the form of lower power rates.

For years after the initial availment of the 10% corporate income tax rate incentive, the developer must attach to the income tax return proof of submission to the DOE and ERC of the required report supported by technical and financial documents under DOE Department Circular No. DC2021-12-0042. To further prove that the savings were passed on to end-users in the form of lower power rates, the developer must submit to the BIR the rates approved by the ERC.

RR No. 7-2022 takes effect fifteen days following publication in the Official Gazette or in a newspaper of general circulation, whichever comes first. The document was published in the Manila Times on July 1, 2022, making immediate review of renewable energy tax incentive documentation essential for taxpayers claiming benefits for periods after effectivity.

Practical Steps for Renewable Energy Taxpayers

Renewable energy developers should begin by confirming whether their project is covered by a valid DOE renewable energy service or operating contract and whether the DOE Certificate of Registration is current and aligned with the registered project. If the taxpayer will claim the income tax holiday, it should secure and attach the BOI Certificate of ITH Entitlement to the annual income tax return. If the taxpayer will claim the 10% corporate income tax rate, it should secure the DOE Certificate of Endorsement before the first year of availment and prepare the required sworn undertaking and ERC-approved rate documentation.

Manufacturers, fabricators, and suppliers should review whether their DOE accreditation, BOI registration, importation documents, DTI certification, DOE prior approval, and customer documentation are complete before claiming VAT-free importation, zero-rated VAT, or the seven-year income tax holiday. Local suppliers dealing with registered renewable energy developers must also update invoicing and VAT treatment procedures to avoid improperly passing on 12% VAT where 0% VAT applies.

Hybrid project owners should secure DOE certification identifying the renewable energy portion of the project and, for common facilities, the renewable energy capacity in megawatts. Accounting teams should also maintain separate books or clear allocation schedules where only part of a facility or income stream qualifies for the incentive.

Businesses claiming renewable energy tax incentives should treat RR No. 7-2022 as a documentation-first regulation. The incentives may be valuable, but the BIR requirements are highly procedural. Missing certificates, incomplete attachments, unsupported VAT zero-rating, lack of DOE or BOI registration, or failure to comply with CREATE Act reportorial requirements can expose taxpayers to forfeiture of incentives and penalties.

How Ablola, Saribong & Gueco Can Help

Ablola, Saribong & Gueco assists renewable energy developers, equipment suppliers, contractors, investors, and corporate taxpayers in structuring and documenting BIR, DOE, BOI, ERC, and CREATE Act compliance. Our tax and business law team can review incentive eligibility, prepare supporting documents for income tax holiday and 10% corporate income tax claims, assess VAT zero-rating treatment, and help align contracts and invoicing practices with RR No. 7-2022.

For renewable energy tax incentive planning, BIR compliance audits, VAT zero-rating documentation, BOI registration support, or legal review of renewable energy contracts and tax positions, contact Ablola, Saribong & Gueco through MakatiLawFirm.com.


Leave a Comment

Your email address will not be published. Required fields are marked *